Sign In | Join Free | My himfr.com
himfr.com

Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.

Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. Innovation seeks development and Cooperation wins the future.

Verified Supplier

2 Years

Home > Steel Truss Bridge >

Steel Truss Bridge Steel Structure Bridge Long Span Bidge Heavy Load Permanent Steel Bridge

Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Steel Truss Bridge Steel Structure Bridge Long Span Bidge Heavy Load Permanent Steel Bridge from wholesalers
     
    Buy cheap Steel Truss Bridge Steel Structure Bridge Long Span Bidge Heavy Load Permanent Steel Bridge from wholesalers
    • Buy cheap Steel Truss Bridge Steel Structure Bridge Long Span Bidge Heavy Load Permanent Steel Bridge from wholesalers
    • Buy cheap Steel Truss Bridge Steel Structure Bridge Long Span Bidge Heavy Load Permanent Steel Bridge from wholesalers
    • Buy cheap Steel Truss Bridge Steel Structure Bridge Long Span Bidge Heavy Load Permanent Steel Bridge from wholesalers

    Steel Truss Bridge Steel Structure Bridge Long Span Bidge Heavy Load Permanent Steel Bridge

    Ask Lasest Price
    Brand Name : Tongkai
    Model Number : Truss bridge
    Certification : ISO,EN1090,SGS ,
    Price : 1500USD ~2000USD/ton
    Payment Terms : L/C, T/T, Western Union, MoneyGram
    Supply Ability : 3000/month
    Delivery Time : 45days
    • Product Details
    • Company Profile

    Steel Truss Bridge Steel Structure Bridge Long Span Bidge Heavy Load Permanent Steel Bridge


    Typical Spans:

    • Longer than 70 meters

    Typical Characteristics:

    • Warren through truss
    • 5-meters bays ensure modularity between spans
    • Class A width: 1m sidewalk + 7m roadway + 1m sidewalk
    • Class B width: 0.5m sidewalk + 6m roadway + 0.5m sidewalk
    • Utilizes steel deck as permanent formwork
    • Double pipe handrails
    • Elastomeric bearings with steel plate reinforcement
    • Deck protection angle
    • High tension Bolts
    • Full hot dip galvanizing to all elements

    Standard Supplied Erection Aids:

    • Bolts spares
    • Drift pins for precise bolt hole alignment
    • Temporary Deck Bracing Angles

    Typical Supply Time:

    • 4 months

    Application:

    ● Long -Span

    ● Permanent or semi-permanent bridging

    ● Heavy Load

    ● Highway bridge

    ● Rural infrastructure project

    ● Construction,forestry,oil and mining activities

    ● Construction site access

    ● Replacement of damaged bridge


    Steel Truss Bridge Steel Structure Bridge Long Span Bidge Heavy Load Permanent Steel Bridge


    Quality Steel Truss Bridge Steel Structure Bridge Long Span Bidge Heavy Load Permanent Steel Bridge for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)